ABOUT THE PROJECT
Problem: Faulty control panel equipment and junction box on an existing submersible pump installation at a NHS property.
DSW’s cost-effective solution: Retrofit a new bespoke control panel, and integrated the control system to their existing BMS interface. Delivered exactly on time, on budget. The trust can now use their borehole supply again and save money on mans water. They can also monitor use with DSW’s intelligent tracking system.