ABOUT THE PROJECT
Problem: Cross contamination from other systems and insufficient storage.
DSW’s cost-effective solution: Remove current tank, install larger tank and make relevant pipework modifications. Tank replaced with some design improvements to ensure optimal performance. Installed new strainers, valves, and returns for a sealed finish.
Tank was a special design TP with internal division baffle.